5-100tph Customized Complete Gold Beneficiation Production Line Rock Gold Processing Plant

Product Details
Customization: Available
Type: Gravity Separator
Voltage: 380V
Shipping & Policy
Shipping Cost: Contact the supplier about freight and estimated delivery time.
Payment Methods:
visa mastercard discover JCB diners club american express T/T
PIX SPEI OXXO PSE OZOW PayPal
  Support payments in USD
Secure payments: Every payment you make on Made-in-China.com is protected by the platform.
Refund policy: Claim a refund if your order doesn't ship, is missing, or arrives with product issues.
Manufacturer/Factory & Trading Company

360° Virtual Tour

Secured Trading Service
Diamond Member Since 2018

Suppliers with verified business licenses

Audited Supplier Audited Supplier

Audited by an independent third-party inspection agency

Number of Employees
14
Year of Establishment
2015-04-16
  • 5-100tph Customized Complete Gold Beneficiation Production Line Rock Gold Processing Plant
  • 5-100tph Customized Complete Gold Beneficiation Production Line Rock Gold Processing Plant
  • 5-100tph Customized Complete Gold Beneficiation Production Line Rock Gold Processing Plant
  • 5-100tph Customized Complete Gold Beneficiation Production Line Rock Gold Processing Plant
  • 5-100tph Customized Complete Gold Beneficiation Production Line Rock Gold Processing Plant
  • 5-100tph Customized Complete Gold Beneficiation Production Line Rock Gold Processing Plant
Find Similar Products
  • Overview
  • Product Description
  • Product Parameters
  • Detailed Photos
  • Company Profile
  • Our Service
  • FAQ
Overview

Basic Info.

Model NO.
WKD-5
Weight
>10T
Material
Carbon Steel
Material Feature
Fire Resistant
Certification
ISO9001:2008
Energy Saving
Energy Saving
Warranty
1 Year
Color
Blue
Customized
Customized
Condition
New
After-sales Service
Engineer Support
Product Name
Rock Gold Separation Plant
Capacity
Customized
Feeding Size
200-300mm
Machine Condition
100% New
Installation
Engineer Guide
After Sale Service
7*24 Hours
Transport Package
No Packing
Specification
Depends on model
Trademark
WKD
Origin
China
HS Code
8474100000
Production Capacity
500 Sets/Month

Packaging & Delivery

Package Size
1000.00cm * 1000.00cm * 1000.00cm
Package Gross Weight
10000.000kg

Product Description

Product Description

5-100tph Customized Complete Gold Beneficiation Production Line Rock Gold Processing Plant5-100tph Customized Complete Gold Beneficiation Production Line Rock Gold Processing Plant

Overview

Gravity gold processing is the most traditional method of extracting gold in rock gold mine used widely. It is more as a secondary process to recover coarse gold in the grinding circuit to create favorable conditions for the flotation and cyanidation. Because of its efficiency in capturing single coarse gold, the process is also in dominant position.

Features

1. The process is simple, low cost, effective for capture single coarse gold
2. Improving beneficiation indicator and overall recovery rate of gold, increase production and reduce the cost.


Widely Used Rock Gold Solution 1:

Hard-Rock Gold Mining Use Jaw Crusher + Hammer Crusher + Shaking Tables
1. Jaw Crusher as the primary crusher and Hammer Crusher as the secondary crusher to crusher gold rocks to get sized fine ore for further processing.
2 It is configured with trough feeder to give materials to a jaw crusher, after jaw crusher grind materials size to be small to hammer crusher .hammer crusher grind materials to be fine then to shaking table to recover gold.
3. The trough feeder it can feed evenly to the crusher.
4. The jaw crusher Preliminary crushing of large stones also can be made mobile type as per request.
5. The hammer crusher the output size is adjustable like 10mm,5mm, etc. for this project it's grind materials to 0-2mm. also can be made mobile type as per request.
6. The shaking table is gravity to recovery gold .with very high recovery rate and It is very friendly to the environment
7. This Plant also can be used for Hard Rock Tin ore/ Coltan ore/ Tungsten Ore/ Chrome 8. The capacity for this process plant can be customized as per request such as 10tph, 20tph,50tph,100tph, etc


Widely Used Rock Gold Solution 2:

Hard-Rock Gold Mining Via Ball Mill + Shaking Tables
1. Loader or Excavator feed raw ore into the hopper;
2. Vibrating feeder feed primary jaw crusher; primary jaw crusher is to crush big stone to medium size.
3. Output of primary crusher sent to fine jaw crusher by belt conveyor; fine jaw crusher is to crush medium sized stone to small size.
4. Output of fine jaw crusher sent to vibrating screen by belt conveyor;
5. Oversized rock is back to fine jaw crusher for further crushing by belt conveyor;
6. Undersized materials sent to one transit ore bin by belt conveyor;
7. Fine ore in transit bin is sent to ball mill via electromagnetic vibrating feeder+belt conveyor. ball mill is to grind ore to powder size.
8. Discharge of ball mill goes to spiral classifier for roughly size separation. Coarse particles will be back to ball mill for further grinding;
9. Fine particles will be sent to the centrifugal concentrator for concentrating fine gold by a slurry pump. 10. Tailings of centrifugal concentrator go to sluice box for recovering more gold;
11. Concentrates of sluice box and centrifugal concentrator are sent to shaking table for fine concentrating gold. The ball mill +classifier forms a closed-circuit grinding system, which can achieve more than 90% of the discharge to 200 mesh (0.074mm) So this flowchart is very suitable for recovering fine powder gold in rocks.


Widely Used Rock Gold Solution 3:
 
Hard-Rock Gold Mining With Wet Pan Mill + Shaking Tables
1. hopper+vibration feeder: raw materials will feed into the hopper by truck or excavator as you want,then the materials will feeded into the jaw crusher by the vibration feeder automatically.
2. jaw crusher: jaw crusher is uesd to crush the rock gold ore, different model of the jaw crusher is with different input size,discharge size and capacity.the model of the jaw crusher is chosed based on the ore size and the capacity you want to process,big ore size need big model and more cost.
3. belt conveyor: belt conveyor is used transport the discharge from the jaw crusher to the hopper,it works automatically, will save much manual work.and the length and width can be customized as you requested.
4. hopper+trough feeder: there are two functions of the hopper and trough feeder
a. make the feeding work to each machine more smoothly.when you feed the materials to the jaw crusher,it will takes some time to get the discharge,the machines behind the jaw crusher will work for nothing at that time,means waste power and release the capacity of the machines behind the jaw crusher.if you add the hopper and trough feeder, each machine can runs better.
b.used to stock the discharge from the jaw crusher.sometimes the ore size maybe big, you need to use a big jaw crusher with big capacity.but you just want to start with a small capacity,then you can add the hopper and trough feeder to stock the discharge from the jaw crusher, and you can chose the hammer crusher with a small capacity behind the jaw crusher,no need to match the capacity with the jaw crusher.when the hopper is full, you can stop the jaw crusher.will save more power.
5 .belt conveyor:belt conveyor is used transport the discharge from the hopper to the hammer crusher,it works automatically,will save much manual work.and the length and width can be customized as you requested.
6. hammer crusher: hammer crusher is used to small the discharge from the jaw crusher, because the feeding size of the wet pan mill is 0-25mm.the discharge from the jaw crusher hard to meet the needs of the wet pan mill. the hammer crusher can do work successfully, there is a sieve under the hammer crusher and the sieve size can be customized as you want, minimum sieve size can be 2mm,the smaller size you feed into the wet pan mill, the more efficent work you will get.
7. wet pan mill: for the rock gold ore, sometimes the gold can be released under the size 0-2mm or 0-1mm or 0-200mesh.these output size will need different machines and also depends on the ore condition.if you need to grind the ore to 0-1mm, you may need the wet pan mill.
8. shaking table: the shaking table is used to get the gold concentrate from the raw materials.when you add the water and materials to the shaking table, the gold will be separated from other stones and minerals which the gravity is lower than the gold.
9. gold smelting furnace: the gold concentrate from the shaking table can be smelted to the gold bar by the gold smelting furnace.will easy to carry the gold and in case of missing. Notes: the wet pan mill and shaking table will need water when works, you can also add water to the hammer crusher,in case blocking the sieve of the hammer crusher.the machines in the video are just for you reference, need to reconfirm based on the ore condition you provide.

 
Product Parameters
2tph rock gold  separation plant
Jaw Crusher PE150*250
Hopper 2m3
Ball Mill 900*1800
Shaking Table 6s
More Capacity Plant, pls contact with us!
 
Detailed Photos
5-100tph Customized Complete Gold Beneficiation Production Line Rock Gold Processing Plant
5-100tph Customized Complete Gold Beneficiation Production Line Rock Gold Processing Plant
5-100tph Customized Complete Gold Beneficiation Production Line Rock Gold Processing Plant
5-100tph Customized Complete Gold Beneficiation Production Line Rock Gold Processing Plant
5-100tph Customized Complete Gold Beneficiation Production Line Rock Gold Processing Plant

 

Company Profile

5-100tph Customized Complete Gold Beneficiation Production Line Rock Gold Processing Plant

WELCOME TO VISIT OUR FACTORY
-- Our customers from over 50 countries and regions.
-- We have 20+ manufacturing experience and can provide custom design.
-- We provide engineer to help you with installation, training, our engineers are also available to install overseas if you need.

5-100tph Customized Complete Gold Beneficiation Production Line Rock Gold Processing Plant

Customer Visting
5-100tph Customized Complete Gold Beneficiation Production Line Rock Gold Processing Plant
5-100tph Customized Complete Gold Beneficiation Production Line Rock Gold Processing Plant
 
Our Service

1) Pre-sale service: Freely provide project designing, process designing, choosing suitable equipment for you.

2) Medium-sales service: Accompany you to complete the acceptance of the equipment, draft the construction scheme and detailed process, and complete process of export

3) After-sales service: Offer considerate technical guidance in installation, debugging and operators training. We are available at any time if you need.

 
FAQ

1.How is the quality of your products? (mining equipment/machine)
Answer: Our products are manufactured strictly according to national and international standard, and we will take a test on every machine before delivery.

2.Guaranteed?
Answer: All of our products are guaranteed for one year. If products quality is not consistent with the description as we described or the promise before you place order, we promise 100% refund.

3.How about price?
Answer: For the complete same machine, we can promise our quality is the best when the price same as other competitors, and our price can be lowest when the quality at standard level.

4.Service and Payment Terms?
Answer: We can accept T/T and L/C; 30% deposit, 70% balance before delivery, which is international trade practice;Finished product pictures will provide to customers before delivery.


Recommend Products

5-100tph Customized Complete Gold Beneficiation Production Line Rock Gold Processing Plant
5-100tph Customized Complete Gold Beneficiation Production Line Rock Gold Processing Plant
5-100tph Customized Complete Gold Beneficiation Production Line Rock Gold Processing Plant

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now