• High Recovery Clay Gold Trommel Washing Machine for Mineral Processing
  • High Recovery Clay Gold Trommel Washing Machine for Mineral Processing
  • High Recovery Clay Gold Trommel Washing Machine for Mineral Processing
  • High Recovery Clay Gold Trommel Washing Machine for Mineral Processing
  • High Recovery Clay Gold Trommel Washing Machine for Mineral Processing
  • High Recovery Clay Gold Trommel Washing Machine for Mineral Processing

High Recovery Clay Gold Trommel Washing Machine for Mineral Processing

Type: Gravity Separator
Voltage: 380V
Weight: 1T
Customization:
Shipping Cost:

Estimated freight per unit.

about shipping cost and estimated delivery time.
Payment Method: visa mastercard discover JCB diners club american express T/T
  Initial Payment Full Payment
Currency: US$
Return&refunds: You can apply for a refund up to 30 days after receipt of the products.
From payment to delivery, we protect your trading.
High Recovery Clay Gold Trommel Washing Machine for Mineral Processing pictures & photos
High Recovery Clay Gold Trommel Washing Machine for Mineral Processing
US $10,000 / Piece
Min. Order: 1 Piece
Diamond Member Since 2018

Suppliers with verified business licenses

Secured Trading Service
Rating: 5.0/5
Manufacturer/Factory & Trading Company

Basic Info.

Model NO.
FC
Material
Casting Steel
Material Feature
Ware Resistant
Certification
ISO9001:2008
Energy Saving
Energy Saving
Warranty
1 Year
Color
Multi Color
Customized
Customized
Condition
New
After-sales Service
1 Year
OEM
Yes
Product Name
Alluvial Gold Washing Plant
Transport Package
No Package
Specification
depends on model
Trademark
JXWKD
Origin
China
Production Capacity
1000sets/Year

Product Description


50tph Alluvial Gold Mining Plant
 
High Recovery Clay Gold Trommel Washing Machine for Mineral Processing
High Recovery Clay Gold Trommel Washing Machine for Mineral Processing

Alluvial/Placer Gold Mining Plant:

1. Washing and Screening System

The excavator feeds raw materials into the mobile trommel screen which have hopper and primary screen. The primary screen is to screen the larger sized gravel to avoid clogging the hopper. At the same time rinse the material with water. Then the materials will into trommel screen which has 2 screen mesh(6mm and 15mm) for second screening. And it will be divided into three types, less than 6mm, 6-15mm and more than 15mm. (6mm and 15mm screen mesh just for reference, we can do what you want)



2. -6mm Alluvial Gold Concentrating System

The alluvial gold below 6mm enters the centrifugal concentrator to produce the concentrates and tailings. Concentrates enters the shaking table to produce the final concentrates. Tailings enters the sluice box for recycling again. One centrifugal concentrator works and the other one removes the collected fine gold. Same as sluice box. The time for manual cleaning on centrifugal concentrator will be 2-6 hours later. The time for manual cleaning on sluice box will be 4-6 hours later.


3. 6-15mm AlluvialGold Concentrating System

The alluvial gold between 6mm and 15mm enters the vibrating sluice box to produce the concentrates and tailings. The time for manual cleaning on vibrating sluice box will be 4-6 hours later. Same as carpet sluice box.


4. +15mm Alluvial Gold ConcentratingSystem

The probability of gold in the +15 mm material is low, so manual picking is recommended.


5. Final Concentrates Processing System

The collected concentrates from contrifugal concentrator, vibrating sluice box and carpet sluice box will into shaking table and then get the final concentrates.
 
we can help provide separation processing flowchart for different minerals 
tin ore silica sand tungsten 
coltan ore gold silica sand titanium
tantalum ore zircon sand coal
cassiterite ore gold sand sand ore
tantalite ore placer gold chromium ore
Diamond ore alluvial gold Monazite Sand
copper ore clay gold tungsten ore
barite ore river gold llmenite
chrome ore river sand wolfram ore
iron ore River sand gold niobium
manganese ore sand gravel rutile
barite ore topsoil Hematite

Detailed Images:

High Recovery Clay Gold Trommel Washing Machine for Mineral Processing
High Recovery Clay Gold Trommel Washing Machine for Mineral Processing
High Recovery Clay Gold Trommel Washing Machine for Mineral Processing
High Recovery Clay Gold Trommel Washing Machine for Mineral Processing
High Recovery Clay Gold Trommel Washing Machine for Mineral Processing

Packaging and Shipping


High Recovery Clay Gold Trommel Washing Machine for Mineral ProcessingHigh Recovery Clay Gold Trommel Washing Machine for Mineral Processing

Company Information

High Recovery Clay Gold Trommel Washing Machine for Mineral ProcessingVictor is a large mineral processing manufacturer for 15 years history, with covering an area of 48,000 square meters and 20,000 square meters for workshop, with various large modernized machinery facilities, professional R&D team and installation team. 

With 32% market share in China and the rest to overseas, already successfully exported to over 50 countries, such as USA, England, Australia, Brazil, Turkey, Italy, Russia, South Africa, Zimbabwe, Sudan, Ghana, Congo, Morocco, India,Indonesia, Malaysia, Philippines, North Korea, Mongolia, Vietnam, Thailand etc.

Our goal is to provide one-stop service for you and assist you to solve all problems from investment to his return in the field of mining, including the preliminary mineral analysis, mineral processing test, engineering design, equipment debugging and technical training etc.. 
We are expert especially at mining separating and lab mining plant, main products as below:


Gold trommel wash plant
Shaking table
Spiral chute separator
Centrifugal gold concentrator
Jig separator machines
Waste recycling machine
Grinding and mill crusher
Flotation cell machine
Magnetic separator
Laboratory mining plant


Package: FCL & LCL export standard container 20GP/40GP/40HQ. 

FCL: main machinery gold shaking table in nude package and bulk in container, spare parts in wooden box or as your special requirement
LCL: machinery are packed in steel frame, base and deck are separately packed. 

Shipping: by sea shipment, by air shipment or by courier express, it depends on you.

Payment Terms: T/T or L/C is preferable. T/T: 30% deposit and the balance before delivery 

We will take photos for your products when finished and show you before delivery. Also keep you informed for any updated information including shipping before you receive it, to let you rest assured. 

Delivery time: shipped in 15 days after payment


FAQ

1.How is the quality of your products? (mining equipment/machine)
Answer: Our products are manufactured strictly according to national and international standard, and we will take a test on every grinder before delivery.

2.Guaranteed?
Answer: All of our products are guaranteed for one year. If products quality is not consistent with the description as we
described or the promise before you place order, we promise 100% refund.

3.How about price?
Answer: For the complete same machine, we can promise our quality is the best when the price same as other competitors, and our price can be lowest when the quality at standard level.

4.Service and Payment Terms?
Answer: We can accept T/T and L/C; 30% deposit, 70% balance before delivery, which is international trade practice;Finished product pictures will provide to customers before delivery.


Our Service

1) Pre-sale service: Freely provide project designing, process designing, choosing suitable equipment for you.

2) Medium-sales service: Accompany you to complete the acceptance of the equipment, draft the construction scheme and detailed process, and complete process of export

3) After-sales service: Offer considerate technical guidance in installation, debugging and operators training. We are available at any time if you need.

Contact

Angela

 
 

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

From payment to delivery, we protect your trading.
High Recovery Clay Gold Trommel Washing Machine for Mineral Processing pictures & photos
High Recovery Clay Gold Trommel Washing Machine for Mineral Processing
US $10,000 / Piece
Min. Order: 1 Piece
Diamond Member Since 2018

Suppliers with verified business licenses

Secured Trading Service
Rating: 5.0/5
Manufacturer/Factory & Trading Company
Number of Employees
14
Year of Establishment
2015-04-16