River Gold Sand Gold Recovery Mining Flowchart

Product Details
Customization: Available
Type: Gravity Separator
Voltage: 380V
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2018

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Number of Employees
14
Year of Establishment
2015-04-16
  • River Gold Sand Gold Recovery Mining Flowchart
  • River Gold Sand Gold Recovery Mining Flowchart
  • River Gold Sand Gold Recovery Mining Flowchart
  • River Gold Sand Gold Recovery Mining Flowchart
  • River Gold Sand Gold Recovery Mining Flowchart
  • River Gold Sand Gold Recovery Mining Flowchart
Find Similar Products
  • Overview
  • Product Description
  • Product Parameters
  • Detailed Photos
  • Packaging & Shipping
  • Mining Project
  • Company Profile
  • Contact Us
Overview

Basic Info.

Model NO.
WKD-Gold PL
Weight
1T
Material
Casting Steel
Material Feature
Heat Resistant
Certification
ISO9001:2008
Energy Saving
Energy Saving
Warranty
1 Year
Color
Multi Color
Customized
Customized
Condition
New
After-sales Service
Yes
Product Name
Gold Trommel Wash Plant
Capacity
100tph
Screen Mesh
15mm+5mm
Mobile Type
Yes
Transport Package
No Package
Specification
based on different size
Trademark
wkd
Origin
China
HS Code
8474100000
Production Capacity
1000sets/Year

Product Description

 
100tph Gold Trommel Wash Plant
 
Product Description

River Gold Sand Gold Recovery Mining Flowchart
1. Washing and Screening System

The excavator feeds raw materials into the mobile trommel screen which have hopper and primary screen. The primary screen is to screen the larger sized gravel to avoid clogging the hopper. At the same time rinse the material with water. Then the materials will into trommel screen which has 2 screen mesh(5mm and 15mm) for second screening. And it will be divided into three types, less than 5mm, 5-15mm and more than 15mm. (5mm and 15mm screen mesh just for reference, we can do what you want)


2. -5mm Alluvial Gold Concentrating System

The alluvial gold below 6mm enters the centrifugal concentrator to produce the concentrates and tailings. Concentrates enters the shaking table to produce the final concentrates. Tailings enters the sluice box for recycling again. One centrifugal concentrator works and the other one removes the collected fine gold. Same as sluice box. The time for manual cleaning on centrifugal concentrator will be 2-6 hours later. The time for manual cleaning on sluice box will be 4-6 hours later.


3. 5-15mm AlluvialGold Concentrating System

The alluvial gold between 6mm and 15mm enters the vibrating sluice box to produce the concentrates and tailings. The time for manual cleaning on vibrating sluice box will be 4-6 hours later. Same as carpet sluice box.


4. +15mm Alluvial Gold ConcentratingSystem

The probability of gold in the +15 mm material is low, so manual picking is recommended.


5. Final Concentrates Processing System

The collected concentrates from contrifugal concentrator, vibrating sluice box and carpet sluice box will into shaking table and then get the final concentrate.
 
Product Parameters
Equipment Model Quantity
Mobile Trommel Screen GTS1855 1 set
Gold Concentrator STLB80 2 sets
Vibrating Sluice FGS15 1 set
Sluice Box L6M*W1.2M 3 sets
Shaking Table LY4500 1 set
Slurry Pump 100RV-SP 2 sets
Water Pump IS series 1 set
Diesel Generator Set 200 KW 1 set
Detailed Photos

River Gold Sand Gold Recovery Mining FlowchartRiver Gold Sand Gold Recovery Mining FlowchartRiver Gold Sand Gold Recovery Mining FlowchartRiver Gold Sand Gold Recovery Mining FlowchartRiver Gold Sand Gold Recovery Mining FlowchartRiver Gold Sand Gold Recovery Mining FlowchartRiver Gold Sand Gold Recovery Mining FlowchartRiver Gold Sand Gold Recovery Mining Flowchart

Packaging & Shipping

River Gold Sand Gold Recovery Mining FlowchartRiver Gold Sand Gold Recovery Mining FlowchartRiver Gold Sand Gold Recovery Mining FlowchartRiver Gold Sand Gold Recovery Mining Flowchart

Mining Project

River Gold Sand Gold Recovery Mining FlowchartRiver Gold Sand Gold Recovery Mining FlowchartRiver Gold Sand Gold Recovery Mining FlowchartRiver Gold Sand Gold Recovery Mining FlowchartRiver Gold Sand Gold Recovery Mining Flowchart

Company Profile

Jiangxi Victor International Mining Equipment Co.,Ltd is a large mineral processing manufacturer for 15 years history, with covering an area of 48,000 square meters and 20,000 square meters for workshop, with various large modernized machinery facilities, professional R&D team and installation team.

With 32% market share in China and the rest to overseas, already successfully exported to over 50 countries, such as USA, England, Australia, Brazil, Turkey, Italy, Russia, South Africa, Zimbabwe, Sudan, Ghana, Congo, Morocco, India,Indonesia, Malaysia, Philippines, North Korea, Mongolia, Vietnam, Thailand etc.

Our goal is to provide one-stop service for you and assist you to solve all problems from investment to his return in the field of mining, including the preliminary mineral analysis, mineral processing test, engineering design, equipment debugging and technical training etc.. 
We are expert especially at mining separating and lab mining plant, main products as below:
Gold trommel wash plant
Shaking table
Spiral chute separator
Centrifugal gold concentrator
Jig separator machines
Waste recycling machine
Grinding and mill crusher
Flotation cell machine
Magnetic separator
Mineral processing lab
River Gold Sand Gold Recovery Mining FlowchartRiver Gold Sand Gold Recovery Mining FlowchartRiver Gold Sand Gold Recovery Mining Flowchart
Contact Us
 

Matthews Lai

Jiangxi Victor International Mining Equipment Co.,Ltd

(eight six one three three six one seven seven nine zero one two)

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier