Introduction
Hydrocyclone is a separation equipment with high efficiency which utilizes centrifugal field to separate two-phase fluid, and it has been applied in classification, thickening, dewatering, desliming, separation, washing and other processes. Slurry is fed to cyclones through inlet in tangential or involute direction (depending on feeding way of the inlet head). Under centrifugal force, large particles will move downwards along outer swirling flow and be discharged through apex as underflow while fine particles will move upwards through inner swirling flow and be discharged from apex finder as overflow.
The features
1.Low equipment cost
2.Easy mounting and dismantling
3.Convenient maintenance
4.Small floor space required
5.Low capital expenditure
6.Large processing capacity
7.A large fluctuation of process.
Structure for cyclone sand separator
1.Overflow Tank 2. The Desilting Tank 3. Desilting Outlet 4. Hydrocyclone 5. Stand 6. Raw Ore Feeding Tube 7. Raw Ore Pressure Tank 8. Overflow Pipe
Technical Parameter
Model |
Internal dia.(mm) |
Inlet pressure(MPa) |
Capacity(m³/h) |
Cut size(μm) |
FX840 |
840 |
0.04-0.15 |
500-900 |
74-350 |
FX710 |
710 |
0.04-0.15 |
400-550 |
74-250 |
FX 660 |
660 |
0.04-0.15 |
160-450 |
74-220 |
FX610 |
610 |
0.04-0.15 |
200-300 |
74-200 |
FX500 |
500 |
0.04-0.2 |
140-240 |
74-200 |
FX400 |
400 |
0.04-0.2 |
100-170 |
74-150 |
FX350 |
350 |
0.04-0.2V |
70-160 |
50-150 |
FX300 |
300 |
0.04-0.2 |
45-90 |
50-150 |
FX250 |
250 |
0.04-0.3 |
40-80 |
40-100 |
FX200 |
200 |
0.04-0.3 |
25-40 |
40-100 |
FX150 |
150 |
0.04-0.3 |
14-35 |
20-74 |
FX125 |
125 |
0.04-0.3 |
8-20 |
20-50 |
FX100 |
100 |
0.04-0.3 |
8-20 |
20-50 |
FX75 |
75 |
0.1-0.4 |
4-10 |
10-40 |
FX50 |
50 |
0.1-0.4 |
2-5 |
7-40 |
FX25 |
25 |
0.1-0.6 |
0.3-1 |
5-20 |
FX10 |
10 |
0.1-0.6 |
0.05-0.1 |
1-5 |
Working Principle
The working principle of hydrocyclone is centrifugal sedimentation, when two phases (or three phases) mixed liquid is fed into hydrocyclone by a certain pressure liquid and produces strong three-dimensional-elliptic rotational movement. Due to the different density of particles, the centrifugal force, the centripetal buoyancy and drag force is different. So most coarse particles (or heavy phase) are discharged from cyclone underflow outlet, and the fine particles (or light phase) from the overflow tube, so as to achieve separation.
Working modes of hydrocyclone includes classification, condensation, dehydration, desliming, sand removing sand, washing, ultrafine classification etc.
Application
cyclone sand separatoris mainly applied to the process of second paragraph grinding, coarse or concentrate re-grinding and the closed-circuit composed by mechanical grading machine.
It is a high efficient grading and de-sliming equipment of fine-particle material.
Detailed Images
Company information
Victor is a large mineral processing manufacturer for 15 years history, with covering an area of 48,000 square meters and 20,000 square meters for workshop, with various large modernized machinery facilities, professional R&D team and installation team.
With 32% market share in China and the rest to overseas, already successfully exported to over 50 countries, such as USA, England, Australia, Brazil, Turkey, Italy, Russia, South Africa, Zimbabwe, Sudan, Ghana, Congo, Morocco, India,Indonesia, Malaysia, Philippines, North Korea, Mongolia, Vietnam, Thailand etc.
Our goal is to provide one-stop service for you and assist you to solve all problems from investment to his return in the field of mining, including the preliminary mineral analysis, mineral processing test, engineering design, equipment debugging and technical training etc..
We are expert especially at mining separating and lab mining plant, main products as below:
Gold trommel wash plant
Shaking table
Spiral chute separator
Centrifugal gold concentrator
Jig separator machines
Waste recycling machine
Grinding and mill crusher
Flotation cell machine
Magnetic separator
Laboratory mining plant
Package: FCL & LCL export standard container 20GP/40GP/40HQ.
FCL: main machinery gold shaking table in nude package and bulk in container, spare parts in wooden box or as your special requirement
LCL: machinery are packed in steel frame, base and deck are separately packed.
Shipping: by sea shipment, by air shipment or by courier express, it depends on you.
Payment Terms: T/T or L/C is preferable. T/T: 30% deposit and the balance before delivery
We will take photos for your products when finished and show you before delivery. Also keep you informed for any updated information including shipping before you receive it, to let you rest assured.
Delivery time: shipped in 15 days after payment
FAQ
1.How is the quality of your products? (mining equipment/machine)
Answer: Our products are manufactured strictly according to national and international standard, and we will take a test on every grinder before delivery.
2.Guaranteed?
Answer: All of our products are guaranteed for one year. If products quality is not consistent with the description as we
described or the promise before you place order, we promise 100% refund.
3.How about price?
Answer: For the complete same machine, we can promise our quality is the best when the price same as other competitors, and our price can be lowest when the quality at standard level.
4.Service and Payment Terms?
Answer: We can accept T/T and L/C; 30% deposit, 70% balance before delivery, which is international trade practice;Finished product pictures will provide to customers before delivery.
Our Service
1) Pre-sale service: Freely provide project designing, process designing, choosing suitable equipment for you.
2) Medium-sales service: Accompany you to complete the acceptance of the equipment, draft the construction scheme and detailed process, and complete process of export
3) After-sales service: Offer considerate technical guidance in installation, debugging and operators training. We are available at any time if you need.
Contact
JiangXi Victor International Mining Equipment Co.,Ltd
Tel/Fax: 86-797-5712751
Mob: +86 133 6177 9811
Add:Guzhang industrial park,Shicheng county,Ganzhou city,Jiangxi Province,342700,China